Sign In | Join Free | My himfr.com
Home > Dry Mix Shotcrete Machine >

Tunnel Culvert Concrete Gunite Machine 6m3/H Shotcrete Sprayer

Henan Tytion Machinery Co., Ltd.
Contact Now
    Buy cheap Tunnel Culvert Concrete Gunite Machine 6m3/H Shotcrete Sprayer from wholesalers
     
    Buy cheap Tunnel Culvert Concrete Gunite Machine 6m3/H Shotcrete Sprayer from wholesalers
    • Buy cheap Tunnel Culvert Concrete Gunite Machine 6m3/H Shotcrete Sprayer from wholesalers

    Tunnel Culvert Concrete Gunite Machine 6m3/H Shotcrete Sprayer

    Ask Lasest Price
    Brand Name : Tytion
    Model Number : PZ-6
    Certification : CE, SGS
    Price : negotiation
    Payment Terms : Western Union, L/C, T/T
    Supply Ability : 180 sets per month
    Delivery Time : 5-8 work days
    • Product Details
    • Company Profile

    Tunnel Culvert Concrete Gunite Machine 6m3/H Shotcrete Sprayer

    Dry Mix Electric Driven Gunite Machine Advanced Technology for tunnel culvert

    Gunite Machine

    Prepare for startup Gunite Machine:
    1. Check the connection of each line of the electronic control system is firm and there is no leakage phenomenon.

    2. Observe the oil mark and check whether the lubricating oil in the reducer is sufficient.
    3. Check whether the fastening of all parts of the machine is correct and reliable.

    TechnicalParameters
    ModelPZ-5PZ-6PZ-6FPZ-7PZ-9/WSP
    Throughput(m3/h)5-5.566-779
    Transport Distance (Tidal Spray) (m)200200200200200
    Applicable Material (Cement/Sandstone) Ratio1:3~51:3~51:3~51:3~51:3~5
    Applicable Material (Water/Ash) Ratio≤0.4~0.45≤0.4~0.45≤0.4~0.45≤0.4~0.45≤0.4~0.45
    Aggregate size (mm)φ20φ20φ20φ20φ20
    Working Pressure (MPa)0.2~0.40.2~0.40.6~0.80.6~0.80.6~0.8
    Feeding height (m)1.11.11.11.11.1
    Rotor speed (r/min)1111111111
    Motor Power (KW)5.55.57.57.57.5
    Motor speed (r/min)960960960960960


    Operation Method of Gunite Machine:
    After the preparation work is finished, the mixing material can be added to the machine. The machine operator should first open the main valve, the valve of the upper air duct opens 1/3 circles, and then adjust the air pressure of the lower air duct (to the cyclone) to about 0.05-0.1 MPa (depending on the delivery distance). Then the sprayer opens the nozzle valve and gives the wet rock surface. At this time, the operator can start the machine and start shotcreting. Now the working pressure is about 0.2-0.4 MPa. According to the water-cement ratio of mixtures and the length of conveying distance, after adjusting and determining the wind pressure to the cyclone, the upper air pipe valve is opened again until there is no more material leakage at the machine outlet.













    Quality Tunnel Culvert Concrete Gunite Machine 6m3/H Shotcrete Sprayer for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Henan Tytion Machinery Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)